|
Project Title:Urumqi City Northern Suburb Outringing Road Project (main northern urban road)
项目名称: 乌鲁木齐市北外环路工程(城北主干道) |
|
ORGANIZER DATA
项目发起单位资料 |
|
Organizer Name: Urumqi City Construction Commssion
单位名称: 乌鲁木齐市建设委员会 |
|
Address:No.88 West Xinmin Road
Urumqi地址: 乌市新民西街88号 |
|
Owner: Feng Ruiyu
法人代表:冯瑞玉 |
Company Manager:
总经理: |
Contact Person: Li Yongbin
联系人: 刘利民 |
Phone: 0991-4625421
电话:0991-4625421 |
|
Fax: 0991-4619200
传真: 0991-4619200 |
E-Mail:WLMQJWJC@126.com |
|
Number of Employees:
雇员人数: |
Incorporation/Founding Date:
成立日期: |
Registered Capital (US$ 10000):
注册资本(以万美元计): |
|
Present Ownership: ■State Owned □Collective owned □Private □Joint/ Cooperative
所有制结构: ■国有 □集体 □民营 □合资合作
□Other (specify) :
□其他(请注明) :国家机关 |
|
|
2002 |
2003 |
2004 |
|
Annual Sales (US$ 10000)年销售收入(以万美元计) |
|
|
|
|
Profit after Tax税后利润 |
|
|
|
PROJECT DATA
项目资料 |
|
Project type: ■New □Expansion □Rehabilitation
项目类型: ■新项目 □扩建项目 □技改项目 |
|
Form of cooperation: ■Joint-venture ■Cooperative ■Technical Expertise □Equipment □Buy-back
拟 合 作 方 式:■合资 ■合作 ■技术引进 □设备引进 □补偿贸易
□Other(specify):BT方式(建设——转让)
□其他(请注明):协商确定 |
|
Project Industry: □Agriculture, hunting, forestry and Fishing □ Mining and quarrying □Natural Gas、chemical industry
项目所属行业: □ 农、林、牧、渔业 □ 采掘业 □石油天然气、化工
□Manufacturing □new high-tech ■city’s basic establishments □Construction
□制造业 □高新技术 ■城市基础设施 □ 建筑业(含码头、道路等的修建)
□Transport, storage and communications □Wholesale and retail trade, food & beverage
□ 交通运输、仓储及邮电通信业 □ 批发和零售贸易、餐饮业
□ Finance and insurance □Real estate □Social service
□ 金融、保险业 □ 房地产业 □ 社会服务业(含旅游等)
□Health, physical education and social welfare
□卫生、体育和社会福利业(含医院等)
□Education, culture and art as well as broadcasting, film and TV industry □Other industries
□教育、文化艺术及广播电影电视业 □ 其他行业 |
|
Approved by Which Level of Government: On February 26th 2004 it was listed into Urumqi Urban Infrastructure And Maintenance Construction Program and at present its feasible project proposal is under appraisal
经何级政府批准立项(批准机构、批准时间、文件编号):2004年2月26日列入乌鲁木齐市基础设施维护建设计划,目前正进行可研代项目建议书的评审。 |
|
Project Description: Urumqi Northern Suburb Outringing Road Project is planned to be invested 1.383 billion yuan with a whole length of 16.5 km. It is designed in terms of main urban road with road red limit being 69 meters. 10 tracks are to be built with two-way. The northern suburb outringing road lies at the juncture of northern urban road and outringing road, starting from North Railway Station section, joining Beizhan road and runs east across Urumqi-Changji High-graded Highway and turns east and runs along the Ninth Transportation Company, Di’uobao township and Kaziwan area, and then horizontally links two radiating roads (Altay road and Hetan road) and ultimately reaches its destination which connects Urumqi-Kuitun High-graded Highway and Qidaowan road. It runs through planned Donghuan road which meets with east Guojing road in eastern urban. At Yannan Overpass it links with planned western outringing road, forming Urumqi outringing enclosure road net. After completion, it is handed over to the city government road office for charges. The specific charge is rated according to Urumqi flexible vehicle number and economic development.
项目描述:乌鲁木齐市北外环路工程计划总投资13.83亿元,全长16.5公里,按城市主干道标准设计,道路红线控制宽度为69米,按双向10车道标修建。北外环路位于市区北部公路环线与外环线之间,起点在北站片区,与北站路相交向东北方向跨越乌昌高等级公路后折东,沿途经九运司、地窝堡乡、卡子湾等片区,横向连接两条放射路(阿勒泰路与河滩北路),最终连接至乌奎高速公路与七道湾路。与规划的东环路贯通,东环路与市区东南侧的东过境路相接,在燕南立交桥处与规划西外环路相接,形成乌市外围闭合城市路网。项目建成后将由市政府保证道路收费,具体收费标准将根据乌鲁木齐市机动车拥有量和经济发展水平确定。 |
|
IRR: 14.8%
内部收益率:14.8%。 |
At discount rate: 12%
折现率:12% |
|
ROE:
股本收益率: |
Pay back Period: 13 years
投资回收期:13年 |
Foreseen construction period: 3 years
预计项目建设所需时间:3年 |
|
Background information on the project:
项目资料情况:
■Brief introduction ■Project advice
■项目简介 ■项目建议书
□Professional study
□经过专业机构审核评估的可行性研究报告 |
Project listed in
该项目属于国家
■encouraged sort
■鼓励
□permitted sort
□允许
□restricted sort
□限制 |
Is there any pollution problem?
有否气、水、固体废料等的污染问题:
□yes ■no
□ 有 ■无 |
INVEST&STOCK RIGHT
投资与股权 |
|
Investment Sought投资方式:
■Cash ■Equipment ■Technical Expertise □Management Expertise □Access to Markets
■资金 ■设备 ■技术 □管理 □市场
□immaterial asset □Other(specify)
□无形资产 □其他(请注明): |
|
Total Project Cost (US$ 10000) :17470
项目总投资 (以万美元计):17470 |
Sponsor (US$ 10000):
项目发起单位投入(以万美元计): |
Investor (US$ 10000):
投资者投入(以万美元计):
|
Loan and others (US$ 10000):
贷款或其他资金投入(以万美元计): |
|
Cost Distribution of local sponsor(US$ 10000)
项目发起单位投资及构成(折万美元)
Total
总额
of which: cash land building machinery other
其中: 资金 土地 建筑 设备 其他 |
|
Cost Distribution of investor(US$ 10000)
投资方投资及构成(折万美元)
Total
总额
of which: cash technology machinery other
其中: 资金 技术 设备 其他 |
|
Cost analysis 资金使用安排 |
|
Proposed Ownership Structure: local sponsor: % investor: % others: %
预计股权结构: 项目发起单位: % 投资方股份: % 其他: % |