|
Project name:Yanhucheng (Salt Lake Township) Scenic Spot
项目名称: 盐湖城旅游景区 |
|
DATA OF THE PROJECT SPONSOR UNIT
项目发起单位资料 |
|
Organizer Name: Xinjiang Yanhu Salt Manufacturing Co., LTD.
单位名称: 新疆盐湖制盐有限责任公司 |
|
Address:Yanhu Chemical Factory of Eastern Suburb of Urumqi, Xinjiang
地址: 新疆乌鲁木齐市东郊盐湖化工厂 |
|
Legal representative: Zheng Shu-ping
法人代表:郑树平 |
General manager: Zheng Shu-ping
总经理: 郑树平 |
Contact Person: Gong Wen-dong
联系人: 龚文东 |
Phone: 0991-5941719 13325622516
电话:0991-5941719 13325622516 |
|
Fax: 0991-5940150
传真: 0991-5940150 |
E-mail: yanhu0221@sina.com gwd@yanhu.cn
电子邮件: yanhu0221@sina.com gwd@yanhu.cn |
|
Number of Employees: 1200
雇员人数: 1200人 |
Date of establishment: Dec. 2000
成立日期:2000年 9月 |
Registered capital (count with 10,000 USD$): 108
注册资本(以万美元计):108 |
|
Ownership composition: □State-run □Collective □Private □Joint venture/cooperation
所有制结构: □国有 □集体 □民营 □合资合作
■Other (specify) : Non-state-owned shareholding system
■其他(请注明) :非国有股份制 |
|
|
2000 |
2001 |
2002 |
|
Annual income from sales (count with 10,000USD$) 年销售收入(以万美元计) |
800 |
900 |
1200 |
|
After-tax profit 税后利润 |
500 |
600 |
800 |
PROJECT DATA
项目资料 |
|
Project type: ■New □Expansion □Technological transformation
项目类型: ■新项目 □扩建项目 □技改项目 |
|
Planed cooperation way: ■Joint-venture ■Cooperation □Technology import □Equipment introducing □Compensation trade
拟 合 作 方 式:■合资 ■合作 □技术引进 □设备引进 □补偿贸易
□Other(specify):
□其他(请注明): |
|
Affiliated trade of the project: □ Farming, forestry, husbandry and fishing □ Extractive industry □Petroleum gas, heavy chemical industry
项目所属行业: □ 农、林、牧、渔业 □ 采掘业 □石油天然气、重化工
□ Manufacturing industry □New and high technology □Infrastructure □ Construction (construction including quay, road, etc.)
□ 制造业 □高新技术 □城市基础设施 □ 建筑业(含码头、道路等的修建)
□Transportation, storage and post and telecommunications industry □ Whole-sale, retail trade and catering trade
□ 交通运输、仓储及邮电通信业 □ 批发和零售贸易、餐饮业
□ Finance, insurance □ Real estate ■ Social service trade (including travelling etc.)
□ 金融、保险业 □ 房地产业 ■ 社会服务业(含旅游等)
□Hygiene, sports and social welfare (including hospital, etc.)
□卫生、体育和社会福利业(含医院等)
□Education, culture and arts and broadcasting, films and TV industry □ Other trades
□教育、文化艺术及广播电影电视业 □ 其他行业 |
|
Approved by Which Level of Government: (Organization of approval, time of approval, serial number of document): The Development and Planning Commission of Xinjiang Uygur Autonomous Regions approved the project setting-up on the No. (2002) 1728 Xin Ji She Hui file in October 6 2002
经何级政府批准立项(批准机构、批准时间、文件编号):新疆维吾尔自治区发展计划委员会在2002年10月6日新计社会〔2002〕1728号批准立项 |
|
Project Description:
This project is located along the golden tourist line and the ancient Silk Road. It is Urumqi City’s major supporting scenic spot construction project, and it was chosen as one of ten scenes in Urumqi in 2004; The following works as salt bath center, ancient tombs and posts, land survey of Salt Lake Museum, etc., geological prospecting, planning and design, project bidding, building and constructing, etc will be completed in the first half of 2004; It is a travel project of against season developed by utilizing the unique geographical environment and natural salt resources. After having more than two months of try opening in 2003, it reflects very fine for market. The mainland visitors account for 30%, and Xinjiang local visitors account for 40%. This project possesses the following features: uniqueness, unsubstitutability, novel, intellectual and deep development of product; There are not the same geological mineral, topography and tourist development project in the hinterland as Dead Sea of Jordan as the Salt Lake in Xinjiang. The building up of the project, its travel market share is expected to account for 30% of the tourist market of Xinjiang; Tourist industry, as one of the focus industries in the development of western regions, it has already been classified as one of the key items by the municipal government of municipal Party committee in 2004 during industry adjustment of Xinjiang, and so, the policy risk of this project is relatively low; The environment of the project is not good enough, there is certain distance between the whole view effect and the development of the scenic spot, and so it is apt to be threatened by the competition of other scenic spots, and it causes shortening of the life cycle of tourist site.
项目描述:
该项目在新疆黄金旅游精品线、古丝绸之路上,是乌鲁木齐市旅游景区开发重点扶持建设项目,在2004年评为乌鲁木齐市十景之一;2004年上半年将完成盐浴中心、古墓驿站、盐博物馆等土地测量、地质勘探、规划设计、工程招标、建设施工等工作;是利用独特的地理环境和盐自然资源而开发的反季节旅游项目,通过2003年两个多月的试营业,市场反映非常好,内地游客占30%、新疆本地游客40%;项目具有独特性、不可替代性、新奇性、知识性、产品的深开发性;目前新疆和内地还没有盐湖这样和约旦死海相同的地矿地貌及旅游开发项目;项目的建成,其旅游市场份额预计将占新疆旅游市场的30%;旅游业作为西部大开发中的热点产业之一,在新疆产业调整中, 已被市委市政府列为2004年重点项目之一,因此,本项目的政策风险较低;项目地的环境条件欠佳,整体景观效果与旅游景区开发要求的水准之间还有一定的差距,容易受到其他旅游景点的竞争威胁,造成旅游地生命周期缩短。 |
|
Internal profit ratio: 17.13%
内部收益率:17.13% |
Discount rate:
折现率: |
|
Earning ratio of the capital stock: 26.89%
股本收益率:26.89% |
Pay back Period: 9.88 years
投资回收期:9.88年 |
Estimated time of project construction: 6 years
预计项目建设所需时间:6年 |
|
Background information on the project:
Project materials situation:
项目资料情况:
■Brief introduction ■Project recommendation
■ 项目简介 ■项目建议书
■Feasibility research report verified and assessed through professional organization
■经过专业机构审核评估的可行性研究报告 |
Project listed in
该项目属于国家
■encouraged sort
■鼓励
□permitted sort
□允许
□restricted sort
□限制 |
Is there any pollution problem?
Whether there are pollution problems of air, water, solid waste material, etc.
有否气、水、固体废料等的污染问题:
□ Yes ■No
□ 有 ■无 |
INVESTMENT & STOCK RIGHT
投资与股权 |
|
Investment way 投资方式:
■Fund □Equipment □Technology □Management □Market
■资金 □设备 □技术 □管理 □市场
□Intangible assets □Other(specify)
□无形资产 □其他(请注明): |
|
Gross investment of the project (count with 10,000 USD$):2500
项目总投资 (以万美元计):2500 |
The amount the project sponsor puts into (count with 10,000 USD$): 875
项目发起单位投入(以万美元计):875 |
Investor put into (count with 10,000 USD$): 1250
投资者投入(以万美元计):
1250 |
Loan or other capital put into (count with 10,000 USD$): 375
贷款或其他资金投入(以万美元计):375 |
|
The investment and composition of the project sponsor unit (count with 10,000 USD$)
项目发起单位投资及构成(折万美元)
Total value 875
总额 875
Among them: Fund 954 Land Building Equipment Other
其中: 资金 954 土地 建筑 设备 其他 |
|
The investment and composition of the project sponsor unit (count with 10,000 USD$)
投资方投资及构成(折万美元)
Total value 1250
总额 1250
Among them: Fund 1431 Technology Equipment Other
其中: 资金 1431 技术 设备 其他 |
|
Usage and arrangement of funds: 1. Project’s subject construction 2.Capital construction 3.Environmental reconstruction 4.Other
资金使用安排 1.项目主体建设 2. 基础建设 3.环境改造 4.其他 |
|
Estimate the stock right structure: Sponsor unit of the project:35% Share of the investors:50 % others:15 %
预计股权结构:股份制 项目发起单位:35 % 投资方股份: 50 % 其他: 15 % |