|
Project Title:Urumqi Railway International Logistics Park
项目名称: 乌鲁木齐铁路国际物流园 |
|
ORGANIZER DATA
项目发起单位资料 |
|
Organizer Name: the people’s government of Toutunhe district of Urumqi
单位名称: 乌鲁木齐市头屯河区人民政府 |
|
Address:No. 1669 west Beizhan road of Toutunhe district of Urumqi
地址: 乌鲁木齐市头屯河区北站西路1669号 |
|
Company Manager:
总经理: |
Contact Person: Zhan Xiaoyi
联系人: 张晓毅 |
Phone:0991-3110253
电话: 0991-3110253 |
|
Fax: 0991-3110253
传真: 0991-3110253 |
E-Mail:jjw3110253@163.com |
|
Number of Employees:
雇员人数: |
Incorporation/Founding Date:
成立日期: |
Registered Capital (US$ 10000):
注册资本(以万美元计): |
|
Present Ownership: □State Owned □Collective owned □Private □Joint/ Cooperative
所有制结构: □√国有 □集体 □民营 □合资合作
□Other (specify) :
□其他(请注明) : |
|
|
2000 |
2001 |
2002 |
|
Annual Sales (US$ 10000)年销售收入(以万美元计) |
|
|
|
|
Profit after Tax税后利润 |
|
|
|
PROJECT DATA
项目资料 |
|
Project type: □New □Expansion □Rehabilitation
项目类型: □√新项目 □扩建项目 □技改项目 |
|
Form of cooperation: □Joint-venture □Cooperative □Technical Expertise □Equipment □Buy-back
拟 合 作 方 式:□合资 □√合作 □技术引进 □设备引进 □补偿贸易
□Other(specify):
□其他(请注明): |
|
Project Industry: □Agriculture, hunting, forestry and Fishing □ Mining and quarrying
项目所属行业: □ 农、林、牧、渔业 □ 采掘业
□Manufacturing □Electricity, gas and water supply □Construction
□ 制造业 □ 电力、煤气及水的生产和供应业 □ 建筑业(含码头、道路等的修建)
□Transport, storage and communications □Wholesale and retail trade, food & beverage
□ √交通运输、仓储及邮电通信业 □ 批发和零售贸易、餐饮业
□ Finance and insurance □Real estate □Social service
□ 金融、保险业 □ 房地产业 □ 社会服务业(含旅游等)
□Health, physical education and social welfare
□卫生、体育和社会福利业(含医院等)
□Education, culture and art as well as broadcasting, film and TV industry □Other industries
□教育、文化艺术及广播电影电视业 □ 其他行业 |
|
Approved by Which Level of Government:
经何级政府批准立项(批准机构、批准时间、文件编号): |
|
Project Description
项目描述(包括项目背景、当前进展情况、市场现状、市场潜力,该类项目竞争状况、项目预计的市场份额等)
The project is located in Toutunhe district of Urumqi City, which is the important node of the New Eurasian Continental Bridge. In May 2008, the "Urumqi Railway International Logistics Park Development Plan" was approved by the Urumqi municipal government. According to the plan, the planning area of the project is about 60 square kilometers and the total investment is 3 billion yuan. The project will be constructed in three phases which began in the year of 2008; by the year of 2010,we will finished the infrastructure and other assistant establishments to form the four main functional areas which can establish dominant position on railway ports in Xinjiang; by the year of 2015,we will try our best to built the Park to socializational and large-scale logistics base of production materials with full equipment, perfect function, appropriate scale, rational layout. Thus it can improve the core status of Urumqi along the Eurasian continental bridge, and build Urumqi to be the fast, efficient and safe railway logistics core area of China’s opening to the west.
该项目位于乌鲁木齐市头屯河区,头屯河区地处新亚欧大陆桥的重要节点。2008年5月,乌鲁木齐市委、市政府通过了《乌鲁木齐铁路国际物流园发展规划》,项目规划面积约60平方公里,总投资拟30亿元人民币,分为三期进行。按照规划和开发的要求,2008年启动,2010年完成铁路物流园一期基础设施及配套项目建设,建成四大主体功能区,在新疆铁路口岸竞争格局中居于主导地位,力争2015年把铁路国际物流园建成设施齐全、功能完备、规模适度、布局合理的社会化、规模化的生产资料物流集聚区,全面提升乌鲁木齐在亚欧大陆桥上核心枢纽地位,使乌鲁木齐成为中国新疆向西开放的快捷、高效、安全的铁路物流核心区。
|
|
IRR:
内部收益率: |
At discount rate:
折现率: |
|
ROE:
股本收益率: |
Pay back Period:
投资回收期: |
Foreseen construction period:
预计项目建设所需时间:3-5年 |
|
Background information on the project:
项目资料情况:
□Brief introduction □(Pre-)Feasibility study
□√ 项目简介 □ 初步可行性研究
□Professional study
□经过专业机构审核评估的可行性研究报告 |
Project listed in
该项目属于国家
□encouraged sort
□鼓励
□permitted sort
□允许
□restricted sort
□限制 |
Is there any pollution problem?
有否气、水、固体废料等的污染问题:
□yes □no
□ 有 □无 |
INVEST&
投资与股权 |
|
Investment Sought投资方式:
□Cash □Equipment □Technical Expertise □Management Expertise □Access to Markets OWNERSHIP
□√资金 □设备 □技术 □√管理 □市场
□Other(specify)
□其他(请注明): |
|
Total Project Cost (US$ 10000) :42857
项目总投资 (以万美元计):
42857 |
Sponsor (US$ 10000):
项目发起单位投入(以万美元计): |
Investor (US$ 10000):
投资者投入(以万美元计):
|
Loan and others (US$ 10000):
贷款或其他资金投入(以万美元计): |
|
Cost Distribution of local sponsor(US$ 10000)
项目发起单位投资及构成(折万美元)
Total
总额
of which: cash land building machinery other
其中: 资金 土地 建筑 设备 其他 |
|
Cost Distribution of investor(US$ 10000)
投资方投资及构成(折万美元)
Total
总额
of which: cash technology machinery other
其中: 资金 技术 设备 其他 |
|
Cost analysis 资金使用安排 |
|
Proposed Ownership Structure: local sponsor: % investor: % others: %
预计股权结构: 项目发起单位: % 投资方股份: % 其他: % |
|
|
|
|
|
|
|
|
|
|
|